SB3CG > Projects > Self Storage

Hover Box Element

Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Hover Box Element

Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Hover Box Element

Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Hover Box Element

Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Self Storage

Project Description

Building systems include unit heaters, gas furnaces, transfer fans and include minimum ventilation units to keep the semi heated buildings from freezing and provide somewhat tempered storage spaces. Ducted or ductless systems for leasing office, ductless split systems for elevator equipment rooms. We have also done in floor radiant heat systems with zoning using valves and pumped loop. Whole building exhaust fans provide fresh air for cooling and removing heat build up in summer months.

Representative Projects

• Federal Way Premier Storage – Federal Way, WA
• Snoqualmie Heated Storage – Snoqualmie, WA
• McLaren Storage – Tacoma, WA
• Burien Storage – Burien, WA
• Kent Storage – Kent, WA
• Dupont Storage – Dupont, WA

Project Features

  • Storage Units
  • Front Office Space
  • Restrooms
  • Elevators and Stairs
  • Equipment Rooms

If You Need An Engineered Solution... We Are The Ones For You

Contact Us